Question 1: Zero Tax Levy Increase Bond

Question 1 is a proposed Zero-Tax Levy Increase Bond. Thanks toBOND good financial management, the district has paid off a large portion of debt incurred from past construction projects, and is in a position to seek approval of an additional $14 million to ENHANCE safety and extend the life and functionality of all buildings and facilities. 




PROPOSED BOND PROJECTS

CLINTON EARLY CHILDHOOD CENTER
Playground Equipment
*Adds several smaller sensory pieces of equipment to playground
 
Cabinet/Counter Upgrade
*
Counter and cabinet repair/replacement in 4 classrooms
Environmental Concern Remediation
*Identify and remove lead paint from exterior soffits

HENRY ELEMENTARY SCHOOL
Playground Equipment
*Replace larger pieces of equipment, and install inclusive equipment
Restroom Upgrades
*Six (6) student restroom upgrades
Cafeteria Upgrades
*New flooring, paint, ceilings, tables, and sound absorption

CLINTON INTERMEDIATE SCHOOL
Restroom Addition
*Student restrooms added to east end of building
Parking Lot Expansion/Drainage Repair
*Expand access to parking spaces with improved flow
*Additional space for car rider stacking
*Address drainage issues between Henry Elementary and Clinton
Intermediate School

CLINTON MIDDLE SCHOOL
Structural Repairs
*Identify and address cause of building settlement *Additional exterior maintenance around building
Restroom Upgrades and Addition
*Reconfigure student restroom at west end of building *Add student restrooms near art room
Classroom Additions
*Addition of three (3) classrooms  
Parking Lot Repair
*Mill and overlay/upgrade existing parking lot at Cardinal Stadium 
Gym Accessibility Upgrades
*New guardrails around existing bleachers
*Addition of floor bleachers on one side of gym
*Refinish gym floor
*New basketball goals
*Paint/wall graphic updates

Band Room Renovation
*Removal of risers *New flooring, paint, ceilings *Addition of sound absorption/diffusion panels *Renovation of storage space/conversion of existing practice rooms to storage space Addition of Band Practice Rooms
*Addition of 4-5 practice rooms

CLINTON HIGH SCHOOL
Secure Entry Improvements
*Provide additional set of doors at entry to limit access to the commons
when accessing the front office


CLINTON TECHNICAL SCHOOL
Classroom Furniture
*Classroom Furniture Allowance
Parking Lot Repairs
*Repair failing parking lot areas

DISTRICT-WIDE
Football Field Turf Replacement
*Replace 11 year old turf to meet safety requirements
Track Resurfacing
*Resurface and repair track
Lease Purchase Pay-Off
*Pay-off Energy Performance Contract
*Rebate of approximately $900,000
*Once paid off will save approximately $125,000/year

HVAC/Roof Repairs
*Funds to provide for HVAC and roof repairs as they are identified


BOND LANGUAGE

QUESTION NO. 1

Shall Clinton School District No. 124 of Henry County, Missouri, issue its general obligation bonds in the amount of $14,000,000 for the purpose of acquiring, constructing, improving, renovating, remodeling, repairing, furnishing and equipping new and existing school facilities, including (1) upgrading playground equipment, cabinetry/counters and remediating environmental concerns, (2) updating the cafeteria at Henry Elementary, (3) constructing additional classrooms, upgrading restrooms, and repairing parking lots, (4) addressing structural concerns, upgrading the gym, renovating the existing band room and constructing additional band room practice areas at Clinton Middle School, (5) acquiring property now leased to the District, (6) resurfacing the track and replacing football field turf, and (7) installing secure entry improvements at Clinton High School?

If this question is approved, the District's debt service property tax levy is not expected to increase above the current debt service property tax levy of $0.8168 per one hundred dollars of assessed valuation of real and personal property.

YES 
NO

INSTRUCTIONS TO VOTERS: If you are in favor of the question, place an X in the box opposite "YES." If you are opposed to the question, place an X in the box opposite "NO."

Website by SchoolMessenger Presence. © 2024 SchoolMessenger Corporation. All rights reserved.